BUILDING FOR THE FUTURE
Construction: Filling up the first rooms
01-12-2011
Installeer Flash® en zet Javascript aan.
The first cool rooms are running and we use them for storage, directly after packing new crop bulbs.
Construction: First new-crop bulbs inside
25-11-2011
Installeer Flash® en zet Javascript aan.
We mark November-24 2011 as the date we have the first new-crop lilies inside the new cool storage rooms.
Construction: First cool rooms almost ready
23-11-2011
The first new cool rooms are almost completed.
We are looking forward to store the first fresh-crop lily bulbs.
Installeer Flash® en zet Javascript aan.
Construction: First new cool rooms
22-11-2011
Installeer Flash® en zet Javascript aan.
Installeer Flash® en zet Javascript aan.
The new cool-store rooms.
By using oversized cooler equipment the average outflow temperature of
the units is much higher than in the old situation. We expect an airflow of
maximum -3 a -4 degrees instead of -7 (!) in the past. This will avoid a huge
part of the dehydration in the coolers. Besides this, all the units are equipped
with continuously variable fans. If the optimum temperature is reached, the fans will
turn down to 40% of the maximum capacity without losing their pressure. A
smooth fresh breeze will be the result which avoid any peak in
temperature. In the past the fans were 'on' or 'off' and after the ‘off’ period the
units always gave full capacity to bring the temperature on the desired
level. Cooling down those peaks costs energy and gave extra dehydration of the bulbs.
Zabo Plant: Under construction
31-10-2011
Installeer Flash® en zet Javascript aan.
Zabo Plant: Under Construction
25-10-2011
Installeer Flash® en zet Javascript aan.
Zabo Plant new cool storage
21-10-2011
Installeer Flash® en zet Javascript aan.
Zabo Plant, Building for the future 2011
18-10-2011
We are working hard to create new cool-storage facilities. The new facility will give us more efficiency and will provide us improved track, trace and long term storage control.